Cashmere Estate - 6 Stages CCL are the lead contractor for the $80 million 380 lot development in Cashmere and Worsleys Valley, Christchurch. Stage 1 was completed in 2018. Currently the new access road along with the earthworks to Stage 4 are almost complete. The works involves bulk cut to fill earthworks, construction and installation of infrastructure such as carriageways, footpaths, cycle lanes, retaining walls, berms, kerb and channel, control structures and drainage. Check out the website for further information about these Cashmere Estate Sections. www.cashmereestate.co.nz |
Curletts Rd - Flood Storage Facility CCL completed the Curletts Road Stormwater Basins for the Christchurch City Council. It provides storage to manage storm events and mitigate the risk of flooding on the Heathcote River Downstream. We moved 250,000m³ of cut to waste and placed 70,000m² of top soil, hydroseeded and completed the footpath construction. |
TIL Freight Yard The construction of this carpark involved removing 10,000m³ of existing failed seal, removing old kerb lines, basing up and prepping the large area ready for resealing. Over 2000m³ of metal was used to construct the basecourse. We finished the new Asphalt surface with line markings for the trucks. |