Work for Downer, NZ
All of us were impressed with the work you completed for us and thought that Mitch was very accommodating to our needs".
- Downer, NZ.
Clearing of Asbestos from QEII Park
"I am extremely proud of you all and that as a team we are delivering an exceptional result for the city, Liam made a good point on passing. The outcome "a clear site" was muted to cost the council over 9 million, we are providing a clear site for much less. The saving put bluntly by Liam - that’s a new library or community centre somewhere in the city"
- Christchurch City Council
Earthworks for NCTIR
"CCL were contracted by NCTIR to complete a 20,000 m3 earthworks cut to fill job located at the pines rail siding. After successfully completing these works they were engaged to complete one of the key sites to reinstating the main north rail line just south of Ward. This site entailed removing 40,000m3 of material to stabilise a slope, repairing a large slip that was threatening the line, and the installation of several culverts to allow them to successfully reinstate the main north line. In the 7 months that CCL were working for us I found them to be superb sub-contractors all work was completed to a high standard and delivered promptly with all safety, environmental and quality controls met. Given the chance I would not hesitate to work with CCL again."
- NCTIR